The specification was to update the existing installation, which was fairly straight forward as it was extremely dated and not energy efficient. The difficulty was the method of installation, running cables without damaging the ceiling or disturbing the classrooms above. The Hall is constructed with a mixture of steel girders and wooden joists however with a well thought of planned and experience, Green Electrical were able to overcome this issue.
Within the lighting specification, our clients requested for the LED installation to be dimmable compatible to create different scenes and a lighting design for a sensory area for children which included colour changing LED lights.
This project was completed in time over the Easter holidays and on the agreed budget.